A Guide to DEWA Approvals in Dubai: Procedures and Regulations
Dubai Electricity and Water Authority (DEWA) approvals are essential for construction, renovation, and electrical installations in Dubai. These approvals ensure compliance with safety and regulatory standards. Whether you are a homeowner, contractor, or business owner, understanding the DEWA approval process is necessary to avoid delays and legal issues.
This guide explains the procedures, requirements, and regulations for obtaining DEWA approvals in Dubai.
What is DEWA Approval?
DEWA approval is an official authorization required for electrical and water connections in Dubai. It ensures that all installations follow safety standards and Dubai Municipality regulations.
Common approvals required from DEWA include:
-
New electricity and water connections
-
Load extension approvals
-
Electrical and water network modifications
-
Solar power system approvals
-
Temporary power connections for construction sites
Every project requiring electricity or water connections must meet DEWA guidelines before starting work.
Who Needs DEWA Approvals?
DEWA approvals are required by:
-
Property Developers – Before starting construction on a new project.
-
Contractors & Engineers – When modifying electrical or water infrastructure.
-
Homeowners & Businesses – For upgrading power loads or installing solar panels.
-
Consultants – To ensure compliance with DEWA standards.
Without DEWA approval, projects cannot proceed, and penalties may apply for violations.
Types of DEWA Approvals
New Electricity and Water Connection
For new buildings, developers must apply for DEWA utility connections. The process includes:
-
Submitting building permits and design plans.
-
Ensuring compliance with Dubai’s electrical safety codes.
-
Inspection by DEWA officials before connection approval.
Load Extension Approval
Businesses or residents needing higher power loads must apply for load extension approvals. DEWA reviews the current setup and verifies if the upgrade is feasible.
Electrical and Water Network Modifications
Any alterations to existing DEWA networks, including shifting meters, require prior approval. The modification process includes:
-
Submitting technical drawings.
-
Approval from DEWA engineers.
-
Conducting a final safety inspection.
Solar Energy Approvals
Dubai promotes solar power adoption through the Shams Dubai Initiative. Those installing solar panels must obtain DEWA’s solar connection approval.
-
Only DEWA-certified contractors can apply.
-
Approval requires technical reports and system details.
-
A final inspection ensures safe installation.
Temporary Power Connections
Construction sites need temporary power supply before a permanent connection is installed. Contractors must submit:
-
Site layout plans.
-
Load requirements.
-
Electrical safety reports.
Once the project is completed, DEWA disconnects the temporary supply.
Step-by-Step Process for DEWA Approvals
Register on DEWA’s Online Portal
All applications must be submitted through the DEWA e-Services portal. Contractors, consultants, and developers need a registered DEWA account.
Submit Application & Documents
Applicants must upload:
-
Project blueprints
-
Electrical and water system designs
-
Load calculation reports
-
No objection certificates (NOCs)
Initial Review by DEWA
DEWA engineers evaluate the submitted documents. If any corrections are required, the applicant must resubmit updated plans.
Site Inspection
For large-scale projects, DEWA conducts a physical site inspection to verify compliance with safety regulations.
Approval & Payment
Once the site passes inspection, DEWA grants approval. The applicant must pay the required fees for connection and metering services.
Connection & Activation
DEWA completes the final connections, and the electricity or water supply is activated.
Documents Required for DEWA Approvals
The required documents vary depending on the type of approval. Commonly requested documents include:
✔ Building permit from Dubai Municipality
✔ Site layout and floor plans
✔ Load schedules and technical drawings
✔ NOCs from relevant authorities
✔ Trade license (for commercial projects)
✔ Solar system specifications (for solar energy approvals)
Incomplete documents can lead to application rejections or delays.
DEWA Approval Fees & Processing Time
Fees
-
The cost depends on connection type, load capacity, and project size.
-
Small residential approvals may cost AED 500 – AED 2,000.
-
Commercial and industrial approvals vary based on power consumption.
Processing Time
-
New electricity & water connections – 10 to 15 business days.
-
Load extensions & modifications – 7 to 10 business days.
-
Solar approvals – Up to 30 days (including inspection).
-
Temporary power connections – 5 to 7 business days.
Delays may occur if documents are incomplete or site conditions require additional inspections.
Common Reasons for DEWA Approval Delays
???? Incomplete Applications – Missing documents can slow the approval process.
???? Non-Compliance with DEWA Standards – Electrical designs must follow DEWA regulations.
???? Pending NOCs – If required No Objection Certificates from other departments are missing.
???? Inspection Failures – Sites that fail safety checks need re-inspections.
To avoid delays, ensure all documents are accurate and that installations meet DEWA guidelines.
Tips for Fast DEWA Approvals
✅ Hire DEWA-Approved Consultants – They understand the exact requirements.
✅ Ensure Complete Documentation – Missing paperwork leads to rejections.
✅ Follow DEWA Safety Standards – Compliance speeds up approval.
✅ Use the Online Portal for Tracking – Monitor progress and avoid errors.
Conclusion
Step-by-Step Guide to DEWA Installation Approvals: What You Need to Know electricity and water connections in Dubai. Following the correct process prevents unnecessary delays and ensures compliance with Dubai’s utility regulations.
Understanding DEWA approval requirements, fees, and processing time helps property owners, businesses, and contractors plan their projects efficiently. Always consult DEWA-certified professionals for accurate submissions and successful approvals.